Financial Institution Data Center #2
Confidential Client
Confidential Client
Project included upgrade of a live data center to meet anticipated load growth.
Equipment installation and full commissioning was conducted in the live data center with no impact to the data center loads.
- Data Center Expansion from 40W/sf to 80W/sf
- Four 2.5MW generators
- Two 2700kW UPS systems
- Second Expansion from 80W/sf to 100W/sq ft using only the existing equipment