TSYS Data Center

Project design included the reconfiguration of the generator plant, replacement of all main switchgear, the UPS systems, and UPS switchgear.
2N redundancy is provided from the dual utility feeds down through the computer room loads and air conditioning.

The new system is capable of being maintained and tested without affecting the critical load.  The work has been accomplished while maintaining normal operation of the data center.
BCE was an integral part of final testing of the systems.
The facility was upgraded to Tier IV.